Risk scenarios

Who it’s for:
 

Chubb supports all kinds of renewable energy businesses and facilities:

  • Onshore and offshore wind farms
  • Solar energy facilities
  • Tidal and hydro energy companies
  • Biofuel producers
  • Landfill gas extraction facilities
  • Waste-to-energy companies

What it covers:
 

We keep your company and facilities ahead of environmental liabilities:

  • First-party business interruption cover upon completion and operation of a facility
  • Automatic cover for ongoing maintenance following construction
  • Biodiversity damage up to the full policy limit as standard
  • First-party replacement costs including environmental improvements
  • Transportation liability as standard for materials transported during construction of facilities
  • Pollution condition specifically includes odours
CASE STUDY

1. Waste to energy facility

Part A.
Bolts holding digestate tank to concrete base failed.

Effect
Flow of digestate broke through earth bund. Digestate flowed onto client’s adjacent field and entered land drains. Land drains discharged into the river and digestate seeped into groundwater.

Costs
Estimated clean up costs £260,000.

Part B
At the same facility, an operator leaves the pump going overnight and overfills the pressurised vessel where the valve has been blocked by debris.

Effect
The vessel explodes with the contents of the facility re-contaminating a recently contaminated field.

Costs
Estimated clean up costs £350,000, plus a business interruption claim of £250,000.

CASE STUDY

2. Composting waste incident

Composting green waste ignited spontaneously at a farm.

Effect
Water used by the fire brigade to extinguish the flames became contaminated by a slurry-like mixture from the compost. It reached a nearby stream and migrated to a lake causing a substantial number of fish to die and damage to the aquatic ecosystem. The Environment Agency required the company to carry out remediation..

Cost
Estimated loss to the business was £550,000.

CASE STUDY

3. Windfarm construction

During construction and operation of a windfarm, one of the turbines experienced a fault.

Effect
Due to the fault, a significant amount of hydrohalic fluid leaked from the turbine and caused damage to the local biodiversity and watercourse.

Cost
Estimated clean-up costs were in excess of £100,000.

Resources

Video
Are your clients exposed to environmental risk?
Report
Environmental risk: Being prepared with a proactive approach

Environmental risk is a part of every organisation’s profile. Strategy and operations are increasingly shaped by regulation, which is often complex to navigate. Chubb’s expertise and partnered approach provides a solution to these challenges